Kalayaan / Caliraya / Botocan HEPP

Laguna, Philippines

Owner:
CBK Power Corporation.
Main Contractor:
IMPSA.

Xayaburi Dam HEPP

View Project

Nam Ngum 2 HEPP

View Project

Ingula Pumped Storage Scheme

View Project

This contract covered expansion works on the above mentioned 3 schemes. It included detailed Engineering, Fabrication, Installation and Commissioning of:

7,000 tonnes of Penstocks and Steel Lining, Intake and Outfall Gates for Kalayaan.
Radial gates and stoplogs with electrical control systems for the Caliraya Spillway.
Rehabilitation of the cable (Skyway) car and derrick crane at Botocan.
Fabrication was carried out in our own workshop on the construction site in Kalayaan.
...
...
...
...
...
...